SCP Solicitation Details |
State Contracting Portal Solicitation Details |
|
|
|
|
Organization |
New Fairfield, Town of |
Project/Solicitation # |
2019-20PWD8 |
Solicitation Type |
Request for Proposal |
Due Date |
01/30/2020 |
Includes SBE/MBE Requirements |
NO |
Qualified Partnership |
NO |
Summary |
Replace/Repair Dock System at Marina |
|
|
Addenda |
-
ADDENDUM # 1 for “Boat Dock Repair” Bid # 2019-20PWD8
“Town of New Fairfield invites all interested parties to submit bids for the Bid Name “Boat Dock Replace/Repair Dock System at Marina”. Bid Number “2019-20-PWD8.” for the 2019-20 Fiscal Year.
This bid has been put on a temporary hold for now.
The original bid opening was schedule for Thursday, January 30, 2020, at 11:00 A.M. EST.
The Town of New Fairfield is issuing an addendum to clarify the Bid opening stated the incorrect date.
Any questions do not hesitate to call 203-312-5653. Date issued January 28, 2020, by Patty Mota.
|
|
|
Contact Name |
Patricia Mota |
E-Mail |
pmota@newfairfield.org |
Phone |
(203) 312-5653 |
FAX |
(203) 312-5658 |
WebSite |
www.newfairfield.org |
|
Additional Description |
The Town of New Fairfield is accepting sealed request for proposals for the Scope of work to perform the following, mobilization and demobilization, demolition, staging and legal disposal of portions of the existing floating dock marina. Furnish and install helical anchors and associated hardware. Work shall include the re-aligning and relocation of the existing docks. Furnish and install elastic rode brackets on existing Dock 2, 3, 4, Main and Transition Dock. Furnish and install mooring hawsers, lines, shackles, and all related components by Seaflex® or approved equal. Connect anchor system to anchors and docks at specified tension. Furnish and install proposed new dock spacers with aluminum framed floating docks with Ipe decking, cleats, rub rails, hinge connections, elastic rode brackets, associated hardware on the Dock 1, Main Dock and Transition Dock. Furnish and install 4’ wide x 12’ long ADA compliant gangway, transition plate and wear plate by Ravens Marine, Inc. or approved equal. All work shall be completed in accordance with project drawings and specifications. Provide an AutoCAD and hard copy survey prepared by Licensed Land Surveyor and certified to A-2/T-2 standards of the docks and as-built anchor locations at the completion of the Project.
|
|
Documents |
|
|
|
|